Generator of the diesel engine
1–stator 2–rotor 3–back cover 4–brush 5–electronic regulator of tension
6–rectifier 7–pulley 8–forward cover 9–vacuum pump
Dismantling
PERFORMANCE ORDER
Installation
Before installation connect to the generator an oil hose.
After installation of the generator connect an oil hose to a branch pipe from the oil pallet.
Clamp a collar of fastening of a hose on a direct part of a branch pipe.
After installation of an oil tube do not bend and do not bring into contact to the block of cylinders an oil tube.
QX4.ONLINE S40.ONLINE A-8.ONLINE W124.ONLINE RX300.ONLINE W140.ONLINE B3-B4.SPACE B3B4.SPACE A-8.SPACE