Hyundai Elantra

since 2000-2004 of release

Repair and car operation



Elantr's Hyundai
+ Petrol engines 1,6, 1,8 and 2,0 of l
+ Diesel engine of 2,0 l
+ greasing System
+ cooling System
+ Fuel system
+ Monitoring systems and decrease in toxicity of the fulfilled gases
+ ignition System
+ System of preliminary heating of the diesel engine
+ Coupling
+ Mechanical transmission
+ Automatic transmission
+ Power shafts, forward and back axes
+ Suspension bracket
+ Steering
+ Brake system
+ Body
- Air central air
   Specifications
   Instruction on coolant application
   Remarks at replacement of elements of central air of air
   Connection of elements of central air of air
   Precautionary measures
   Installation of manometers for pressure measurement
   Discharge of central air of air
   Pumping of atmospheric air from central air
   Connection of the final valve to a cylinder with a coolant
   Charging of central air of air
   Verification of operational characteristics
   Oil for greasing of the compressor of the conditioner
   Check and adjustment of a tension of poliklinovy belts
   Conditioner compressor
   Plug of coupling and pulley of the compressor of the conditioner
   Coil of initiation of coupling
   Check of a gap of coupling
   Fan, condenser and relay
   Dryer receiver
   Sensor of threefold (double) pressure
   Heating and ventilation block
   Fan
   Air filter
   Drive of a zaslonka of supply of fresh / retsirkuliruyemy air
   Check of the engine of the fan
   Relay check
+ Electric equipment
Electric circuits



Precautionary measures

    Before separation of elements of central air of air it is necessary to prepare tools and adaptations for service of system so that to leave disconnected system elements on as smaller time is possible. At separation of components of central air of air immediately close connections by the corresponding covers for an exception of hit of moisture in system. All spare elements and tubes of central air of air should be stored in tight packing. Repeatedly do not bend earlier formed tubes. All tools, the coolant distributing a collector, measuring devices and tubes should be stored in a dry and pure place.